McClure Engineering

Paperwork Snafu
8:05 pm
Tue March 5, 2013

Mistake Increases Cost for Macomb Project

Credit Rich Egger

How much is a paperwork mistake worth? In the case of a Macomb road project, the answer is about $125,000.

The project calls for improvements to the intersection of Bower Road and Route 136. The work will be paid for by the city, the Illinois Department of Transportation (IDOT), and a grant through the Community Development Assistance Program (CDAP).

The original low bid of $969,922 came from Laverdiere Construction.

Read more
Wigwam Hollow Road
10:53 pm
Tue September 4, 2012

Macomb Bridge Replacement Details Released

Looking north at the Wigwam Hollow Road bridge
Rich Egger
  • The public hearing on the Wigwam Hollow Road bridge replacement project

More information is now known about plans to replace the Wigwam Hollow Road bridge in Macomb.

A public hearing on the project was held during the City Council's September 4 meeting. Eric Moe of McClure Engineering said the bridge will be widened from 20 feet to 30 feet. A sidewalk will be added on the east side for pedestrians and bicyclists.

Moe said the bridge will be doubled in length to 200 feet. It will stretch from Jana Road to Woodland Lane. He said the new length will prevent floodwaters from topping the bridge.

Read more